Bathtub


Drain installed, and moisture barrier stapled up. Once the tub is in, I'll put up the rest of the moisture barrier, all the way to the ceiling. Words cannot express exactly how hosed I will be if I mismeasured that drain placement.


Tub ready for final placement. It's a tight fit. That horizontal 2x4 is what supports the tub on that side. Hope I measured that right, too...


Alas, I mismeasured the drain. It needs to be half an inch longer. Fortunately, it's in one of the two spots that is not a big deal to fix.


Drain all fixed. The brass is just the drain. There's a chrome fixture that screws onto it.


Tub in final position, all caulked down.


While waiting for the caulk to dry, I hung the new door.

Let's get those walls up.